How does a client-side implementation consultant help a Lebanese ERP project?
An implementation consultant on the client side makes sure the implementer's build follows your agreed rules. In Lebanon that means testing every currency and rate scenario before go-live, controlling cash and checks in more than one currency, loading opening balances with their original currency and rate, planning go-live around power and connectivity risks, and supporting staff through hypercare. I work remotely, alongside your implementer, with no vendor ties.
Last reviewed by Vikas Saroj
A Lebanese ERP project can pass every standard test and still fail in its first month. The cause is usually not a bug but a mismatch: the implementer configured one exchange-rate logic, finance works with another, and cash in two currencies is reconciled outside the system.
I act as the client-side implementation consultant, working beside your implementer. They configure and build; I keep the currency rule register, cash procedures and requirements at the center of the project, review their designs, organize testing by your own staff and recommend, with evidence, when it is fit to go live.
Delivery is remote, and the working language is English. Arabic and French documents and training are prepared by the implementer or by bilingual staff on your side, and I make sure they are tested and approved.
Each activity is aimed at a first month on the new system that finance can explain line by line.
Plan, decision log, risk register and a brief steering meeting run from your side, with written notes after each session so owners and managers abroad stay informed.
Every design decision touching rates is checked against the register your accountant approved: which rate type applies to sales, purchases, cash, payroll and revaluation, and who updates rates.
I review design documents and configuration, ask for demonstrations on your scenarios, log change requests and make sure customizations are documented and handed over.
Cash desks per currency, deposits, transfers between boxes, petty cash and post-dated checks where used, designed as procedures with controls and tested before go-live.
Templates, trial loads and reconciliations for balances held in pounds and dollars, each open item keeping its original currency and rate, with sign-off by your accountant.
Go-live planning that allows for power and internet interruptions, with fallback procedures, backup checks and a hypercare routine that keeps issues visible every day.
Configure against agreed rules
Test currency, cash and documents
Go live and stabilize
The failure points in Lebanon are specific enough that they can be listed before a project starts. Most of them come back to currency, cash and continuity.
None of these are exotic. They are predictable, which means they can be designed out with clear ownership on your side. The general implementation method is on my ERP implementation page, and if a project has already stalled, fixing a failed ERP implementation is the better starting point.
The single most useful document on a Lebanese ERP project is the currency rule register: a short, approved list stating the functional and reporting currency of each company, which rate type applies to each kind of transaction, where rates come from, who updates them and how open balances are revalued. If you completed business analysis, it already exists. If not, I write it with your finance team and accountant before configuration goes further.
From then on, every design document from the implementer is checked against the register. I ask them to demonstrate, on your own data, a sale quoted in dollars and paid in pounds, a supplier payment in cash dollars, a payroll journal and a month-end revaluation, and I compare the results with what your accountant expects. Differences go into the issue log with an owner and a date.
The same discipline applies to change requests. A new rate type or a special pricing rule can affect reports across the system, so each request is assessed for its impact on currency logic before your sponsor approves it.
I also make sure the implementer documents every customization and that your company holds its own administrator and hosting credentials. If the lead consultant becomes unavailable, the project should slow down, not stop.
Many Lebanese businesses handle significant volumes of cash, often in both pounds and dollars, across outlets, branches or delivery staff. A system that records only a daily sales total cannot show where a difference arose. I treat cash as a process to design and test, not as a single bank account.
Typical design points include:
Each point becomes a UAT script run by the people who actually handle the cash, with your finance team checking the resulting ledger entries. I track defects to closure and do not recommend go-live while a cash control that matters to finance still fails. The ERP testing and UAT page describes the testing method generally.
Lebanese companies usually migrate from a local accounting package, spreadsheets, or both, and the source data often mixes currencies within the same column. Migration therefore starts early, led by someone in finance who knows the history of the accounts, using load templates the implementer and your team both accept, and repeated rehearsal loads.
The rules I insist on:
Each trial load is reconciled and the differences explained before the next. The switch date falls on a month boundary, letting the old ledger close fully first. Payroll usually stays with your provider; I agree how its journals arrive by company, cost center and currency, and how the cutover month is handled. For method, see ERP data migration; for a template, the migration checklist.
Go-live in Lebanon needs a resilience plan as well as a cutover plan. Before the date is confirmed, I check with your IT lead and the implementer that servers or routers are on protected power, that backups were taken and restored successfully during testing, and that each site knows what to do if the connection drops. For outlets, that may mean a tested offline point of sale procedure; for offices, a short paper or spreadsheet fallback with a rule for entering the data afterwards.
The go or no-go review then looks at UAT sign-off, reconciled opening balances, trained users, the currency register applied in practice and support arrangements. An unresolved critical item postpones the switch.
Hypercare follows the switch. Issues are logged in one place and reviewed daily with the implementer and key users, prioritized by business impact. Early problems tend to be habits: a cashier using the wrong currency desk, a rate not updated, an invoice printed from an old French template. I stay involved through the first month-end close and the first VAT data extract, then hand over with documented support routines.
All of it runs remotely. Not yet decided on a platform? Read about ERP selection in Lebanon; broader context sits on the Lebanon ERP consultant page and the Lebanon hub, and ERP go-live support describes this stage generally.
Tell me about your business and current systems. I’ll suggest the most sensible first step.
Book a Consultation
Not sure which ERP you need?
Share your business requirements with me and I will help you understand the right process, architecture and platform before implementation.
It is a short document listing each company's functional and reporting currency, which rate type applies to sales, purchases, cash, payroll and revaluation, where rates come from and who updates them. Your accountant or finance head approves it. I use it to check the implementer's design and to write the test scripts.
I confirm with your IT lead and implementer that key equipment is on protected power, backups have been restored successfully in testing, and every site has a written fallback for outages. Data loading is scheduled with time to restart if interrupted. The aim is that an outage delays work rather than corrupting it.
On Lebanese projects with an implementer, I oversee rather than configure: they build, I check the build against your requirements and currency rules and run testing from your side. On some smaller Zoho, Odoo or ERPNext projects without an implementer, I can guide your administrators through configuration directly.
The engagement runs in English. Training in Arabic or French is delivered by your key users or the implementer, from guides reviewed by bilingual colleagues. My part is to base the training on tested processes, especially cash and currency procedures, and confirm each role is covered before the go-live decision.
Yes. I begin with a short review of the plan, configuration, currency handling, open issues and documentation, then agree priorities with your management. If the currency logic or migration is fundamentally wrong, fixing that comes before anything else, even if it means moving the go-live date.
Every business is different. Share where you are today and what you want to fix, and I’ll tell you honestly whether and how I can help.
Book a Consultation
Book a consultation to talk through your processes, systems and goals. I’ll reply with practical next steps - no obligation.