Specifications that make proposals comparable

What belongs in an ERP requirements specification for an Egyptian company?

Numbered, testable lines by process area, plus statutory lines your advisor confirms: e-invoice and e-receipt submission to the Egyptian Tax Authority, signing, item codes, rejections, VAT and withholding where they apply, and record retention. Add rules for installment sales and post-dated checks, Arabic printouts, hosting and access conditions, integrations and migration, each ranked by its owner and referenced in demos, the contract and acceptance tests. The work is remote.

Last reviewed by Vikas Saroj

Egyptian ERP buyers often hold several proposals that differ in platform, scope and assumptions. Comparing them is hard because each implementer answered a slightly different question. A precise requirements specification fixes the question, so price, scope and risk can finally be set side by side.

I write ERP requirements specifications for companies in Egypt, with every line worded so it can be demonstrated, priced and tested. Tax authority lines are drafted from your advisor's guidance and marked as confirmed. Operational lines come from the plant, site, sales and finance owners who will use the system.

Delivery is remote, through structured online reviews and a shared register. If process discovery is still needed, start with the Egypt ERP business analysis. This page covers the document that follows and how it travels into the tender, the contract and acceptance.

ERPNext Stock Summary page listing items by warehouse with projected quantity bars and Move / Add actions
  • One question for every bidder
  • Tax authority lines as tests
  • Installment and check rules
  • Signing and submission conditions
  • Owner and priority per line
  • Baseline the contract cites
What I Do

Requirements specification services in Egypt

Each service delivers part of the written specification or keeps it reliable once implementers, lawyers and testers depend on it.

Document Structure

Scope by legal entity, plant and branch, functional sections by process area, statutory and non-functional sections, integrations, migration, reports and a glossary of the Arabic terms your staff use.

E-Document Test Lines

Submission, signing, item coding, rejection and cancellation for e-invoices and e-receipts, each written as a line a vendor must demonstrate and your advisor has confirmed for your activities.

Installment and Check Lines

Payment schedules, post-dated checks received and issued, deposit, return and rescheduling, stated precisely so implementers show the full lifecycle rather than a simple receipt.

Non-Functional Conditions

Where data and backups sit, who holds the signing credentials, what happens when submission fails, role separation, audit trail and availability for plants and branches, answered in writing.

Proposal Comparison Annex

An RFP annex where each bidder answers every line with a set response code, so existing and new proposals can be normalized against the same reference before scoring.

Traceability and Baseline

A register linking each line to its demo scenario, fit-gap entry and UAT case, plus a signed baseline and change log the implementation contract can rely on.

How I Work

Define, test the wording and sign the specification

Define

Sections, scope and first draft

01
Request an Assessment
  • Confirm entities, plants and branches
  • Draft lines per process area
  • Gather advisor confirmations
  • Agree priorities with owners

Test the Wording

Every line demonstrable

02
Discuss Your Project
  • Split vague or combined lines
  • Add non-functional conditions
  • Map lines to demo scenarios
  • Build the response annex

Sign

Baseline and change control

03
Talk About Next Steps
  • Run owner review sessions
  • Issue the signed baseline
  • Record changes with approvers
  • Hand identifiers to UAT

How an Egyptian specification is organized

A specification that implementers can price consistently needs a predictable shape. I agree the outline with your sponsor before any lines are written, so finance, operations and IT all contribute to the same document.

  • Scope: each legal entity, including any in a free zone or special economic zone with different treatment, plus plants, warehouses, sites and branches, and what is deferred.
  • Functional lines: sales and collections, installment contracts where relevant, purchasing and imports, inventory, production or project costing, and finance and the close.
  • Statutory lines: grouped so your advisor can review them together.
  • Non-functional lines: hosting, signing, access, audit and availability.
  • Integrations, data migration and reports.
  • Glossary: the Arabic and English names for documents and statuses, so bidders and staff mean the same thing.

Each line carries an identifier, an owner, a reason and acceptance wording. One requirement per line is a firm rule; sentences joined with "and" are where proposals meet half a requirement and claim all of it. If processes are still unmapped, the Egypt ERP business analysis comes first. The wider document structure is described on the ERP BRD consulting page.

E-invoice, e-receipt and check lines a tester can run

The tax authority section is where vague wording costs most. I draft it from your advisor's guidance, mark each line confirmed, and keep the interpretation of the rules with them. Example lines:

  • Each business-to-business invoice, credit note and debit note within scope is signed and submitted to the Egyptian Tax Authority, and its submission identifier and status are stored on the document.
  • Retail sales within scope are issued as e-receipts from the point of sale, using the method your advisor and implementer confirm.
  • Every item carries the code your advisor specifies, and an invoice cannot be submitted with an uncoded item.
  • A rejected document is routed to a named role with the reason, can be corrected and resubmitted, and its history is kept.
  • VAT and any withholding on purchases are calculated using the treatments your advisor lists.

Installment sales and post-dated checks get equally precise lines:

  • A contract generates its payment schedule, and each check is linked to its installment with due date and bank.
  • A check moves through the statuses your finance team uses and affects the bank balance only when cleared.
  • A returned or rescheduled check updates the schedule and the customer balance without manual journals.

Each line is something a vendor can demonstrate and a tester can later mark as met or not.

Non-functional conditions bidders must answer

Non-functional lines risk being reduced to "secure and scalable" in a specification. I write them as conditions that each bidder answers in writing, which is far harder to gloss over.

Signing and submission. Who holds the signing credentials, where the signing happens, what occurs if the credential or the connection is unavailable, and whether documents queue for later submission without blocking dispatch.

Hosting and data. The data center or cloud region holding live records and backup copies, vendor personnel with access, evidence of restore drills, and the format in which a full extract of records and attachments would be handed over. Personal data handling is framed for your advisor to relate to Egypt's data protection law.

Access and audit. Roles separating price setting, discount approval, invoicing and posting; an audit trail on item codes, prices, credit limits and check statuses.

Performance and availability. Tied to real pressure points, for instance branches invoicing together on the last trading days or a production shift posting consumption, not to abstract figures.

Language. Which screens and printouts must work in Arabic, listed by document. The engagement runs in English; Arabic sample wording is prepared or reviewed by bilingual staff or a local partner.

The answers become evidence in the Egypt ERP selection scoring.

Integrations, migration and priority setting

Every interface gets a line naming where data comes from and goes to, how often it runs, who owns it and how errors surface. For Egyptian companies these often include the tax authority connection itself, point-of-sale systems issuing e-receipts, bank statements, payroll results from a provider or payroll package, and reporting feeds to a foreign parent.

Migration lines specify what moves and how: open customer and supplier balances, installment contracts with remaining schedules, uncleared checks with due dates, item master data with codes already assigned, stock by location and the cost basis your accountant accepts. A migration scope that covers only master data is a gap bidders rarely point out on their own.

Owners sort their lines into Must have at go-live, Should, Could and Won't for this phase. Tax authority lines that apply to you will normally sit in Must, but I still push owners to keep the Must group short elsewhere, because a long one hides the requirements that truly decide fit. The Won't list is recorded so nothing is later claimed as implied.

Delivery of these lines is described on the ERP integration and ERP data migration pages.

From tender to contract, and gaps to check

For a tender, the annex asks every bidder to classify each line as met in the standard product, met through setup, needing development, needing a separate product, or not met. Explanations are welcome but cannot replace the code. If you already hold proposals, I can send the annex to those implementers and normalize their answers before scoring. The ERP RFP consulting page sets out the wider tender process.

Identifiers then carry forward into demo scripts, the fit-gap matrix and UAT cases, so every line has a visible fate. Once process owners and the sponsor have reviewed their sections, the document is frozen as a signed baseline. Your contract cites that version, and anything altered afterward is logged with its reason and the person who approved it.

Gaps that weaken Egyptian specifications, whoever writes them:

  • E-invoicing covered, but e-receipts for retail outlets forgotten.
  • No owner named for signing credentials.
  • Item coding treated as a go-live task rather than a requirement.
  • Installment checks handled as ordinary receipts.
  • No data export requirement for a future change of provider.

The engagement is remote and free of vendor commissions. Wider context sits on the Egypt ERP consultant page and the Egypt overview.

Not sure where to start?

Tell me about your business and current systems. I’ll suggest the most sensible first step.

Book a Consultation
Related

Related Services

  • ERP Requirements Gathering
  • ERP BRD Consulting
  • ERP RFP Consulting
  • ERP Gap Analysis
  • ERP Testing & UAT
  • ERP Vendor Proposal Review
Egypt

More for Egypt Businesses

  • Egypt overview
  • ERP Consultant
  • Freelance ERP Consultant
  • ERP Business Analyst
  • ERP Selection Consultant
  • ERP Implementation Consultant
  • ERP Audit Consultant
  • ERP Rescue Consultant
  • CRM Consultant
  • System Integration Consultant
Other Markets

ERP Requirements Consultant Elsewhere

  • USA
  • UK
  • UAE
  • Saudi Arabia
  • Qatar
  • Oman
  • Kuwait
  • Bahrain

Not sure which ERP you need?

Do not choose software first.

Share your business requirements with me and I will help you understand the right process, architecture and platform before implementation.

  • Independent ERP advice before you invest - I do not resell software
  • Work directly with Vikas - no account managers or junior handoffs
  • Business analysis before software implementation
  • One consultant who understands both your business and the technology
FAQ

Questions About ERP Requirements Egypt

No. A specification is the most reliable way to compare proposals that answered different questions. I write it from your processes, issue it as an annex to the bidders you are considering and ask them to respond per line with fixed codes. Their answers then become comparable and can be carried into the contract.

No. That determination belongs to your tax advisor. I turn their guidance into requirement lines covering submission, signing, item codes, rejections and cancellations, record who confirmed each one, and make sure every bidder demonstrates them in the same way. Lines still awaiting confirmation stay marked as open.

Usually yes. The business analysis explores how your company works and what the system must support. This service produces the formal specification from that work: one testable requirement per line, owners and priorities, non-functional conditions, a response annex for bidders, traceability into demos and tests, and a signed baseline for the contract.

Each process owner signs their section, your advisor confirms the statutory lines, and the sponsor signs the whole document. I run the review sessions, keep the comment log and issue the baseline. Lines nobody is willing to own are flagged before sign-off rather than left to cause disputes later.

Still have questions? Let’s talk them through.

Every business is different. Share where you are today and what you want to fix, and I’ll tell you honestly whether and how I can help.

Book a Consultation
Vikas Saroj seated at a meeting table with a laptop and notebook
Working Model Remote · Worldwide
Email Address hello@vikassaroj.com
Book a Consultation

Let’s Discuss Your ERP Requirements Egypt Project

Book a consultation to talk through your processes, systems and goals. I’ll reply with practical next steps - no obligation.

Chat on WhatsApp